WRFA-LP 107.9 FM

A listener supported, non-commercial, low power FM radio station in Jamestown, NY.


Stream WRFA

  • Home
  • News
    • Local News
    • WRFA Election Coverage 2025
    • Local Arts and Entertainment
    • Station News and Events
    • Audio Posts
    • Video
  • Listen
  • Programming Guide
    • Interactive Schedule
    • I Remember
    • YWCA Jamestown Broadscast
    • Arts on Fire LIVE
  • Local Shows
    • Alex’s Variety Hour
    • Arts on Fire
    • Arts on Fire LIVE
    • Chautauqua Lectures
    • Chautauqua Sunrise with Doc Hamels
    • Community Matters
    • Da Platform
    • Da Unwind
    • Diamond Run Radio
    • The Latin Inspiration
    • Local Rush Hour
    • Power Chord Hour
    • Remembering Rock n Roll
    • Small Things Considered
    • Stormin Norman’s Prime Time Sports Show
    • The Swedish Hour
    • Third Street Garage
    • YWCA Jamestown Broadscast
  • Audio Vault
  • About
    • Join the WRFA Team
    • E-Newsletter Sign Up
  • Donate
    • WRFA Supporters
  • Contact
You are here: Home / News / Local News / City Council To Vote On Issuing Bond For Cassadaga Water Pump Station Project

City Council To Vote On Issuing Bond For Cassadaga Water Pump Station Project

April 27, 2026 By WRFA Radio Leave a Comment

Interior of the Cassadaga Water Pump Station by Wendel Engineering

Jamestown City Council will vote tonight on issuing a bond for work to be done to the Cassadaga Pump Station.

The resolution under new business requests the city issue Bond Anticipation Notes in the amount of $1.5 million at prevailing interest rates, with proceeds being paid to the Board of Public Utilities general fund to be used to fund the design and engineering of the Cassadaga Water Pump Station project.

Wendel Engineering has estimated that design costs over the next year will be $1.5 million, which exceeds the Water Department’s available cash reserves for this project.

According to a note on the voting session agenda, BPU staff believe that the issuance of Bond Anticipation Notes is the appropriate mechanism for short-term borrowing for the Cassadaga Pump Station design and engineering. Bond anticipation notes can be renewed annually for up to five years prior to being paid off through revenue or issuance of bonds. The timing of the request coincides with the BPU’s request to renew the BPU’s 2025 BAN for water and sewer division capital projects.

BPU General Manager Kris Sellstrom told City Council at their last work session that this is a multi-phase project. It has already received $5 million in grant funding from the State Environmental Facilities Corporation. Sellstrom said the BPU will continue seeking grant funding for the project.

Wendel Engineering said the project plan includes the replacement of 5,300 linear feet of 24‑inch cast‑iron pipe and 1,600 linear feet of 18‑inch pipe to improve system reliability and performance. Additional improvements identified include upgraded pumps, modernized electrical systems, emergency power enhancements, and a larger ground storage tank to support future system expansion.

Council also will vote on a request by the Jamestown Department of Development to apply for up to $150,000 per project through the Appalachian Regional Commission (ARC) “Area Development Program” grant program made available through Southern Tier West (STW).

There are three requests DOD wishes to submit. Two are for 50% matching funds for a grant from Empire State Development to do planning and feasibility studies on properties owned by Mark Tabone and El Greco. These properties are part of the Chadakoin River Basin project. The third request is for funding to clean up, maintain, and convert properties the City recently took control of on the Riverwalk.

If awarded, the City is responsible for 50% matching funds. Matching funds could include in-kind services or additional grant funds, which would reduce the cash commitment from the city for awarded funds.

The voting session is at 7:30 p.m. in the City Council Chambers on the second floor of City Hall. The meeting is open to the public and will be livestreamed on jamestownny.gov.

Share this:

  • Share on Facebook (Opens in new window) Facebook
  • Email a link to a friend (Opens in new window) Email
  • Share on Bluesky (Opens in new window) Bluesky
  • Share on Threads (Opens in new window) Threads
  • Share on Reddit (Opens in new window) Reddit
  • Share on LinkedIn (Opens in new window) LinkedIn
  • Share on Tumblr (Opens in new window) Tumblr
  • Share on Pinterest (Opens in new window) Pinterest
  • Share on X (Opens in new window) X
  • Print (Opens in new window) Print

Filed Under: Local News Tagged With: Appalachian Regional Commission, Cassadaga Pump Station, Cassadaga Water Pump Station project, Chadakoin River Basin Activation Project, El Greco Woodworking, Empire State Development, Greater Jamestown Riverwalk, Jamestown Board of Public Utilities, Jamestown City Council, Jamestown Department of Development, Kris Sellstrom, Mark Tabone, New York State Environmental Facilities Corporation, Southern Tier West, Wendel Engineering

Donate to WRFA and help support Community Radio in Jamestown, NY.

Leave a ReplyCancel reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Licensed by Reg Lenna Center for the Arts

Donate

On Air Now

  • Democracy Now
Stream WRFA

Corporate Support

Donate to WRFA
Donate to WRFA

Recent News

  • City Council To Vote On Issuing Bond For Cassadaga Water Pump Station Project
  • Chautauqua County Soil & Water Receive More Than $300,000 For Water Quality Improvements
  • TRC Direct Support Professional Robin Kestler Recognized By ANCOR
WRFA LP 107.9 FM is licensed by the Reg Lenna Center for the Arts in Jamestown, NY.

Copyright © 2026 WRFALP.com 107.9 FM

 

Loading Comments...